MARO Sensor · TRAFFIC INSTRUMENTS

INERTIAL COURSE FROM STARS TO ALGORITHMS
01 / 06

NEWS AND DEVELOPMENTS

Development
continues.

All news
Large-tonnage vessel sailing on the high seas MOVEMENT IN SIX DEGREES OF FREEDOM
ON BOARD · HIGH SEAS
WORKING CONDITIONS

Accuracy matters
in motion.

When the ship is operating, measurements help the equipment maintain the correct coordinates and orientation.

WORK ENVIRONMENT
Research vessels · pipelayers · floating cranes · marine robots

02 / DEVICES MARO Sensor

NewLarge render of the MSG-25 gyrocompassCOURSE · ROLL · PITCH

Gyrocompass
MSG-25.

A Russian-developed gyrocompass for determining the course and movement parameters of a vessel. For installation as part of marine and naval navigation systems.

Heading accuracy
0.1° / cos latitude
Roll / pitch
0,005°*
Vessel speed
up to 90 knots*
Working latitudes
up to 85°*
Declared resource
100,000 hours*

Specifications follow the operation manual. The current documentation and delivery configuration are available on request.

Composition and information about MSG-25 ↗

MS SERIES · FOUR VERSIONS

Motion reference
units for vessels.

From MRU to execution with GNSS and RTK. Select a model to access information about the device and its integration.

03 / MEASUREMENT ACCURACY

Small angles.
Major responsibility.

Two angular deviations. Same distance. Let's see how the geometric displacement changes as the angle decreases.

CURRENT ANGLE ON THE DIAGRAM0,000°

Building a 0.1° deviation

GEOMETRY OF TWO ANGULAR DEVIATIONS
REFERENCE0,1°
→
DISTANCE1 000 km
≈
OFFSET0,0 m
0,1°0 km1,000 km

Δ⊥ = L × tan(α). The vertical scale of the angles is increased for clarity. This is a comparison of the geometry of two constant angles, not a prediction of navigation system error, and not a comparison of heading characteristics with roll and pitch.

From measurement to adjustment

04 / CALIBRATION AND MAINTENANCE

Accuracy starts
with calibration.

Zero offset, scale factor, and relative orientation of the axes affect the motion measurement. Calibration allows these systematic errors to be identified and taken into account.

XYZMEMS
IMU
01 / ZERO OFFSET02 / SCALE03 / NON-ORTHOGONALITY
01

Zero offset

Non-zero output when there is no measured motion.

02

Scale factor

The difference between the actual impact and the sensor reading.

03

Non-orthogonality of axes

The axes of the sensitive elements are not located exactly at right angles.

Laboratory calibration in static and dynamic modes, with a calibration certificate.

Material "Calibration" ↗
SEPARATE STATEMENT ABOUT MC-22±0,0001°per year

Long-term roll and pitch drift. Factory calibration once — no repeat every two years.

Source of the statement ↗

05 / CONVERSION

MRU replacement
for your vessel’s needs.

Replacement of foreign sensors with MARO devices. The selection begins with the installed model, operating conditions and on-board system interfaces.

MC-22 for MRU sensor replacement scenario
TRANSITION
ON MC-22

REPLACEMENT SCENARIO

Compatible with your on-board system.

MRU models that can be replaced with MC-22. Exact interchangeability is confirmed for your device.

KongsbergMRU-S · MRU-3 · MRU-H · MRU-E · MRU-5 · MRU-5+
SMCIMU-106 · IMU-008 · IMU-108
Teledyne TSSDMS-05 · DMS-10 · DMS-25 · DMS-525 · DMS-550
EdgeTechMRU-333 · 333G · 333D
OthersInertialLabs MRU-2B Basic · Vectory Horizon-505 / Horizon HD · SBG Ekinox-M
For selection you needinstalled model · operating mode · mounting and axles · power supply · output interfaces · composition of the on-board system
Material "Re-equipment" ↗

06 / PARTNERS

The maritime sector.
Engineering partnerships.

Shipbuilding, ship automation, navigation and marine technologies. Partners MARO Sensor.

NPO Aurora
01NPO Aurora
Almaz Shipbuilding Company
02Almaz Shipbuilding Company
Tethys Pro
03Tethys Pro
Sitronics
04Sitronics
Gazprom fleet
05Gazprom fleet
Almaz Central Marine Design Bureau
06Almaz Central Marine Design Bureau

DIRECT CONTACT WITH THE DEVELOPER

Let’s discuss
your project.

Device selection, MRU replacement or calibration. Tell us about the vessel and the system — let’s start with your task.

Discuss the project
ADDRESS
199004, St. Petersburg,
5th line V.O., 42